HOW IT IS CALCULATED
Calculate machine-time cost
Multiply print duration by an hourly machine rate.
Instant resultClear formulaRuns locally
01Values
02cost = hours × hourly rate
03Result
8 hours × 2.5/hour = 20.
Hourly rate can include more than depreciation
A chosen rate can represent wear, maintenance, overhead or desired margin depending on the workflow.
02
In short
What logic does the calculator use?
cost = hours × hourly rate
Example?
8 hours × 2.5/hour = 20.